Consulting ‘Baltic Chemical Complex‘ on legal and commercial matters in the EPC project for the construction of a polyethylene production complex with a projected capacity of up to 3 million tons per year in the Kingisepp District of Leningrad Region. The project’s cost exceeds 11 billion euros. This project of the Baltic Gas Chemical Complex (GCC) in Ust-Luga is a part of the ethane-containing gas processing complex (which includes, alongside the GCC, the Ust-Luga Gas Processing Complex) — a large-scale program for the deep monetization of ethane-containing (‘rich’) gas, carried out by PJSC Gazprom and AO RusGazDobycha in Ust-Luga. The project, implemented in two phases, will utilize the most advanced production technologies, including two ethane pyrolysis units with a capacity of 1.4 million tons of ethylene per year each, and six polyethylene production units with a total capacity of up to 3 million tons per year.
Consulting for the Russian-Korean contractor, “OMZ-Daelim,” within the scope of implementing an EPC project for the construction of a liquefied natural gas (LNG) production and transshipment terminal in the port of Vyssotsk, Leningrad Oblast, with a capacity of 660,000 tons of LNG per year. The “Cryogas-Vyssotsk” plant is the third major Russian enterprise for LNG production (the other two being the “Sakhalin-2” project plant and the “Yamal LNG” plant). The complex located within the Vyssotsk port area comprises three main components: an LNG production plant with a capacity of 660,000 tons per year, a gas pipeline connection from the main gas pipeline “Leningrad-Vyborg-Border” spanning 43 kilometers, and jetty structures for LNG loading.
Consulting the client during the implementation of an EPC project for the construction of the Ak-Sug Mining and Beneficiation Plant on legal, technical, and commercial aspects of project realization. The capacity for ore extraction and processing is 24 million tons per year. The average annual production volume is approximately 500,000 tons of copper-molybdenum concentrate. The “Ak-Sug” project is among the top five largest copper reserves in Russia, with JORC mineral resource estimates of 5.1 million tons of copper and 121 tons of gold.
Consulting for “Belebeevsky Dairy Plant” (part of the Savencia Group, France) within the scope of an EPC project for the construction of a soft cheese production facility in the Republic of Bashkortostan. The project aims to increase the milk processing capacity at the Belebeevsky Dairy Plant from 168,000 to 200,000 tons per year. Additionally, it seeks to raise the production volume of hard cheeses from 13,500 to 16,000 tons and initiate the production of soft cheeses using French technology
Advising the Italian energy engineering company Belleli Energy CPE Srl in a dispute with PJSC Bashneft regarding the quality of supplied reactors within the scope of the project for the restoration and reconstruction of the “Hydrocracking” unit at the “Bashneft-Ufaneftekhim” territory
Providing support to JSC “Hyproksygen” in the project for the construction of a fueling station complex for JSC “AERO Sheremetyevo
Advising private investors in the implementation of an EPC project for the construction of a small-scale LNG plant
Consulting the client in a project involving the reconstruction of a shale processing plant (Leningrad Region)
Advising the Biomax Group (China) on the matter of participation in the implementation of a project for the establishment of the Abinsk Thermal Power Plant (2×450 MW) and the 1×325 MW fuel and energy cluster “ATEC” (Krasnodar Territory)
Advising the shareholders of the “AGROINVEST” group of companies in the context of an EPC project for the construction of a greenhouse complex spanning 120 hectares in the Kaluga Region
Advising shareholders within the scope of an EPC project for the construction of the “Torchino” greenhouse complex
Advising the company “GEA Grasso Refrigeration,” a part of the German industrial holding GEA Group Aktiengesellschaft, on the matter of constructing a poultry meat processing factory for “Miratorg” in the Bryansk Region
Consulting on the M-3 Project – “Ukraine” – from Moscow through Kaluga, Bryansk to the border with Ukraine (towards Kyiv) on sections km 124 – km 173 and km 173 – km 194: in terms of drafting a long-term investment agreement for the reconstruction, maintenance, repair, major overhaul, and operation of the toll-based highway
Consulting on the M-11 Project – “Moscow-St. Petersburg High-Speed Highway” on sections km 543 – km 646 and km 646 – km 684, involving the preparation of a concession agreement and analysis of the tender documentation
Advising CJSC “LANIT” in the CHP project “12 Tons”
Consulting on the M-4 Project – “Don” – from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk on the section km 1091.6 – km 1319 (Section 4), specifically related to the preparation of the operational agreement